Challenge: optimise the design and reduce cost. Solution: custom production from drawing and sample. Result: sample delivered within 15 working days and the design locked in.
AIRTAC — Industrial automation
Challenge: new-product development and component matching. Solution: filter elements at different ratings supplied for assembly trials. Result: sample within 20 working days and rapid batch delivery afterwards.
DAIMLER — Automotive
Challenge: gas-emission flow control. Solution: design proposal with samples submitted and iterated. Result: customer requirement fully met.
International diaphragm-pump brand
Challenge: exhaust noise reduction on a new pump platform. Solution: muffler element customised from drawing. Result: smoothly supported the customer's development schedule.